BS 5975 2019 Extract - Flipbook - Page 5
BRITISH STANDARD
BS 5975:2019
Contents
1
2
3
4
5
5.1
5.2
6
6.1
6.2
7
7.1
7.2
7.3
7.4
8
8.1
8.2
8.3
8.4
8.5
9
9.1
9.2
9.3
9.4
9.5
9.6
10
10.1
10.2
10.3
10.4
10.5
10.6
10.7
Page
Foreword
Introduction
Section 1: General
Scope
Normative references
Terms and definitions
Abbreviations and symbols
Overview of temporary works procedures and training
Overview of procedures
Figure 1 4 Typical contractual interfaces between parties on a project
Figure 2 4 Lines of responsibilities where a single contractor or a principal contractor (PC) is
co-ordinating the temporary works
Figure 3 4 Lines of responsibility where either a principal contractor's (PC) appointed subcontractor or a client's contractor co-ordinate their own temporary works
Figure 4 4 Schematic representation of relationships between principal contractor and
contractor (client appointed or sub-contractor) including PC9s TWC and contractor9s TWC
Training
Section 2: Procedural control of temporary works
Procedures
Introduction to procedural control
Table 1 4 Implementation risk classes for temporary works and examples of mitigation measures
Temporary works register
Clients9 procedures
General (Commercial/public clients)
Clients appointing contractors other than PCs
Client's DI
Domestic clients
Designers9 procedures
General
Designers' DI
Permanent works designers
Temporary works designers
Principal designers
Contractors9 procedures
Organizational interfaces
Contractors' DI
Responsibilities
Principal contractor
Contractors other than PC
Third-party employed contractor
Supplier/manufacturer procedures
Suppliers of temporary works equipment
Suppliers9 DI
Suppliers9 procedures
Verification of design information
Provision of information
Provision of design data
Provision of information for the safe use of equipment
vii
1
2
2
2
4
9
13
13
17
19
21
22
23
25
25
25
28
29
30
30
31
31
32
33
33
34
34
35
35
36
36
37
38
40
41
42
42
42
42
43
43
43
43
44
© THE BRITISH STANDARDS INSTITUTION 2019 3 ALL RIGHTS RESERVED#I