BS 5975 2019 Extract - Flipbook - Page 47
BRITISH STANDARD
9.3.1.3
9.3.2
BS 5975:2019
j)
the checking of the erected temporary works, and control of their use, maintenance and
dismantling, in stages where necessary, to ensure compliance with the design and any
hold points; and
k)
where necessary, the issue of a formal